Phase 1 of the Central Administration Campus (CAC) project encompassed
the programming, design, construction, activation, commissioning, training, close-out, and opening of a multi-level Administration building; demolition of two existing buildings; the construction of North Campus Road and East Campus Road to allow full vehicular and pedestrian access around the perimeter of the campus; and restoration of pavement and landscaping at the project site located on McDonnell Road at West Field Road at SFO. The completed CAC consolidates four Divisions – Museum, Design & Construction, Airport & Environmental Planning, and ITT – into a single administrative cluster.
Systems Designed
- Systems Designed Special Systems Equipment Rooms (SSER), Special
- Systems Rooms (SSR), and Telecom Rooms (TR)
- Structured Cabling
- Security
- High-density WiFi
RLS was appointed as prime technology consultant through Perkins + Will / Mark Cavagnero Associates, a Joint Venture. RLS furnished designs for the campus’ technology infrastructure, including telecom, security, and wireless.